Blog

How does kitchen installation work?

The main steps in kitchen installation: layout, leveling, cabinets, worktop, sink, appliances and final adjustments.

The layout is checked first

Before installation, the position of lower cabinets, upper cabinets, worktop, sink and appliances is checked. This matters because a small mismatch at the start can create a problem at the end.

Main steps

Assembly and positioning of lower cabinets.

Leveling and fixing.

Cutouts for sink or hob when needed.

Worktop and backsplash installation.

Upper cabinet installation.

Sink, mixer and built-in appliance fitting according to the request.

Final adjustment of doors, drawers and visible details.

Why photos matter

For kitchens it is useful to send photos of the place, plumbing points, power outlets and modules in advance. This helps confirm if anything needs clarification before the visit.